News

Mosaic VFD Sled

Mosaic Sled

MJM Electric, Inc. is doing a full electrical buildout on a 5 KV 2000 HP VFD Sled for Mosaic. MJM Electric, Inc. is installing conduit, medium and low voltage wiring, control wiring, indoor and outdoor lighting, 5 KV incoming switchgear, transformer, 2000 HP VFD and RTU cabinet.

Read More

Covanta Crane Replacement

MJM Electric, Inc. is involved with the installation of two new overhead cranes at the Covanta Pasco Refuse to Energy Plant. This project includes replacing existing switch gear, cable tray installation, wiring systems for power, controls and communication.

Read More

GAF Sill Yard MCC Upgrade

GAF Still Yard

The project started off with the installation of a new MCC room and all the associated drives and gear which also had a new generator backup system. The next task was comprised of installing new tray throughout the still yard, as well as the installation of new feeders to 18 existing motors and control cables to PLC cabinets located in several  areas of the plant.

Read More

TECO South Hillsborough Operation Center Roadway Project

TECO South Hillsborough

TECO Installed a new road from the back of their property to a new road installed by the county. MJM was tasked in installing (2) gate operators, (2) electrical services and the grounding of approximately 3,000 feet of fencing. Along with the gate operators we installed card readers for the gate operators.

Read More

Mosaic Recognizes MJM Electric, Inc.

Mosaic Safety Awards 2023

For over thirty (30) years MJM Electric has been one of the few preferred electrical contractors to perform work in the various Mosaic facilities in Florida. Every year Mosaic recognizes the contractor’s that they partner with for exceeding Mosaic’s Safety Performance Goal. The past year was no different for MJM Electric.

Read More

Sunshine Skyway Bridge ATS Replacement

Sunshine Skyway Bridge ATS Replacement

MJM Electric was recently tasked with an electrical project serving a prominent Tampa Bay area landmark – The Sunshine Skyway Bridge.

Read More

Ruskin TECO Generator Replacement

MJM Electric was contracted by TECO to disconnect and physically remove an existing 250KW generator at the Ruskin TECO facility.

Read More

Erik Axson Recognized For Jobsite Safety

Erik Axson

MJM Electric recently recognized one of the field employees who went above and beyond for safety. Erik Axson was recognized while working on the job site for making safety a priority.

Read More

Safety Committee

MJM Electric is committed to a safety first culture that is clearly evidenced in our company tagline, “Safety and Quality are our priorities!” One of the many ways that we ensure that we are not just talking about ‘safety’ as an ideal but rather ‘safety’ as a practice is that years ago we formed a Safety Committee. The safety committee is currently chaired by Matt Woodward. Matt is also the Shop Superintendent and therefore directly involved with all manpower in the field as well as operations between all project managers. In addition to the chairman the committee is made up of 5 additional members. Traditionally the membership is equally divided between office and field employees to ensure proper representation of all parties. The current member are Bobby Bolling and Joy Parshell from the office and Leon Justin, Chuck Minnicks and Brian Lynch from the field.

Read More

NECA President Visits MJM Electric

NECA President at MJM Electric

MJM Electric was recently visited by the President of NECA, Kirk Davis. While here Kirk toured the MJM Electric Office Headquarters as well as our warehouse and prefabrication shop.

Read More

  • Contact Request Form

    MJM Electric would like to talk to you about your next industrial or heavy commercial project. We serve clients all over the the Southeast United States. Please contact us to give us the details.

  • Contact Us